Machinery Safety 101

CSA Z1002 Public Review – 5 Days to Go!

, <span class="caps" data-src=

If you down­loaded the draft from the CSA web site, remem­ber that the PDF will lock on 18-Mar, and you will no longer be able to do any­thing with it. If you haven’t looked at it yet, NOW IS THE TIME! Com­ments must also be sub­mit­ted by mid­night on the 17th, so please sub­mit them as soon as pos­sible. No sub­mis­sions will be accep­ted after the 17th of March!

If you don’t have the draft already, get it here. Com­ments can be sub­mit­ted in the same place as you down­load the draft. DO NOT SUBMIT COMMENTS TO THIS BLOG.

If you need more inform­a­tion on the draft or on sub­mis­sion of com­ments, please con­tact the CSA Pro­ject Man­ager, Ms. Eliza­beth Rankin, elizabeth.rankin’at’csa.ca, +1 (416) 747‑2011.

Privacy Preference Center

Necessary

Advertising

Analytics

Site use analytics

google.com

Other